Per Matthews
COO/CCO
Technology readiness (TRL)
The PITCH is designed for landing on the HXT re-entry hub and pull the Internal Tree Cap in open sea. With it’s 1400kg, it is light weight and easy to handle on wire from a vessel or rig, and operated subsea by the ROV.
It has the following benefits:
Pulls ITC with 125 tons force Protects seal surface on both ITC and re-entry hub during the landing, pulling and recovery operation Operated by the ROV Run overboard with a subsea crane or winch May be configurable to other operations; example is open water pulling of Bore Protector.
Field-proven per Nov. 2023 on 10 wells