Jan Gerhard Norstrøm
Managing Director
At the beginning of the 21st century, offshore production became more complex with each new project, moving into deep waters, and to areas with harsh environments. The design and operation of these new developments were pushing the limits of available multiphase flow simulation capabilities. At the same time, the demands on efficient risk and cost control increased. The development of LedaFlow started with the objective to give the industry the tool it needed to tackle those new challenges.