Knut Stefanussen
Chief Commercial Officer
Technology readiness (TRL)
A pull-in operation is a complex matter with interfaces between multiple contractors and disciplines. The equipment is heavy, and the operations often include installation in confined spaces with difficult access. In addition to this, we often find that a material handling plan for the installation of the equipment is not available.
Axess provides a complete package covering all requirements for a successful pull-in operation. Our deliverables include engineering (material handling planning, method statement, structural calculations), design & supply of winches/lifting equipment and execution offshore (rope access, rigging, inspection & certification of lifting gear - Axess is an EoC).