Trond Sægrov
Sales Manager
Technology readiness (TRL)
IKM Testings CTS systems used during the top hole drilling operation are generally of a very flexible design, and we has been involved in CTS Services for more than 20 years.
IKM Testings CTS solutions are based on 2 essential pre-requisites relative to the drill system and drilling program:
For standard CTS operations control and monitoring of the system performance is done by use of pressure gauges, flow meters and close cooperation with the drilling crew onboard the rig. IKM supervisors, having been part of the development, design and operation of the systems for years.
Low manning: Standard crew consists of 4 persons for 24/7 operation